Trident ServicesProducts

[ tab past navigation ]
Services
Products
Solutions
Partners
Support
News
Company







Section 508 Compliant
Section 508
compliant


Bobby WorldWide Approved 508

Trident Services: Software Products: CICS/EM Features & Benefits

CICS/EM
(kicks-em)
CICS/Environment Manager

Feature Functions

CICS/EM Batch
Interface
  • Open and Close CICS Files from batch jobs - individually or group(s).
  • Enable and Disable Transactions from batch jobs - individually or by group(s).
  • Enable and Disable Transient data queues from batch jobs - individually or by groups.
  • Unlimited concurrency - no single threading due to control file or connection limitations.
  • All function can be performed from any system. There are no LPAR or SYSPLEX dependencies. All access is through VTAM.

AutoInstall
  • Generates up to 40 million non-duplicating terminal ID's.
  • Generates terminal ID's based on VTAM NETNAME.
  • Supports site specific requirements for some terminals concurrently with random generated ID's.
  • Supports non-duplication between many CICS regions on multiple systems. No system dependencies.
  • Supports console autoinstall.

Temporary Storage management
  • Deletes orphaned queues by user specified constructs of USERID/TERMID and a static prefix or suffix.
  • Deletes orphaned queues based on relative reference, based on time.
  • Can capture queue names and associate them with a terminal ID's for deletion during autoinstall delete processing.

Early Warning System
  • Basic Ping function that can report on region availability based on user specified metrics.
  • Can reduce expensive redundant monitoring and CPU consumption yet still provides proactive availability monitoring.

Dump suppression
  • Allows removal of BTAM support for sequential terminal and increases DSA size below 16 MB line.
  • Provides an interface to set dump suppression for both Transaction and System dumps.

User Interface
  • Allows access from the Internet/Intranet for USERID searches and/or terminal information.
  • Provides access to internal CICS/EM control and allocation information for review and/or update.

Competitor comparison:
IPCP - SDS Inc.
  • Concurrency - Only 1 batch job can access the control file at a time.
  • System dependency - IPCP batch jobs have to run on the same system as the CICS region.
  • Only CICS to batch feature.

Competitor comparison:
DADS/Plus - Computer Associates.
  • High cost of ownership.
  • Only CICS to batch feature.

Competitor comparison:
CAFC - Netec, Inc.
  • Difficult to install and set-up.
  • High cost of ownership.
  • Only CICS to batch feature.

Competitor comparison:
CEMT/batch - MacKinney.
  • Minimum functions.
  • Only CICS to batch feature.

This document also available as a word file CICS/EM Features & Benefits Word document

See also the CICS/EM Product Profile




- Home -
Services - Products - Solutions - Partners - Support - News - Company
- Sitemap -


Trident Services
1260 41st Avenue, Suite K, Capitola, CA 95010
831-465-7661 - 800-887-4336
FAX 831-476-0966
osem@triserv.com
counter



Trident Services Trident Services